Case law · Appeals court · Federal

W. D. Haden Co. v. Southern S. S. Co.

Decided
February 12, 1931
Docket
No. 5905
Status
Published
Judges
Foster
Jurisdiction
Federal

Cited 0 timesNo negative treatment found in this library

What does the opinion say?

FOSTER, Circuit Judge.

The only question presented on this appeal is as to the amount of damages to be awarded to appellant.

A collision occurred in the Houston ship channel on September 19, 1927, between the barge Lola, owned by appellant, and the steamship City of Houston, owned by appellee, and the Lola was sunk. On July 30, 1928, an interlocutory deeree was entered allowing appellant to recover 90 per cent, of the damages caused by the collision. The case was referred to a commissioner to fix the damages.

After the barge was raised and placed in dock, there was a joint survey, and items of repairs to be made were indicated by the surveyors. Bids were received, and, appellant, being the lowest bidder, in the sum of $4,000, was permitted to do the work itself. Included in the items of repairs indicated by the surveyors was the removal of the sheating on the barge for the purpose of inspecting, and, if necessary, caulking her sides, decks, and bottom, the sheating to be replaced, using partly new material. The commissioner found this work had not been done; and allowed only $2,000 for the repairs instead of $4,000, the sum claimed. The commissioner also reduced an item of $350, for the services of a diver in raising the barge, to $200. All of the other items claimed by appellant, including demurrage of $235, were allowed in full. Exceptions to the commissioner’s report were overruled by the District Court, and a deeree was entered in the sum of $5,071.50, with interest at 6 per cent, from the date of the interlocutory deeree, July 30, 1928.

Appellant contends that, if the amount of damages is fixed with reasonable certainty by inspection and testimony of competent surveyors, the injured party may recover that amount whether he repairs his vessel or not. It is enough to say that this theory has no application to the present ease. The commissioner found that the barge was old, and her total value at the time of the collision was about $6,000. The total amount of damages claimed was $7,785, which, deducting 10 per cent, according to stipulation, would make the recovery demanded $7,006.50, considerably more than the value of the barge. Appellant did not prove up the cost of the various items of repairs actually made with certainty, and there was evidence before the commissioner tending to show that the cost of removing and replacing the sheating would be between $1,500 and $2,500. It is certain that this work was not done. It also appears that the amount allowed for the services of the diver was all that was paid, and appellant is seeking a profit on this item.

We think that on the whole ease the judgment of the District Court does substantial justice between the parties, and that appellant has been awarded full damages.

Affirmed.

Cite this

W. D. Haden Co. v. Southern S. S. Co., No. 5905 (Court of Appeals for the Fifth Circuit February 12, 1931)

No reporter citation is stored for this case. This line is built from the stored case name, docket number, court and decision date.

The court’s opinion as stored in our database. This is the stored text for research. It is not legal advice; check the official source before you rely on it.